This is about two building projects of mine, a kitchen made in 2012 and a gym from 2026.
Kitchen
My old kitchen had an old gas oven, a wooden counter top and old cabinets from the time when the house was built in 1938.
It was high time for a renovation; a stove with induction cooktop, new white goods and a nice countertop made out of stone.
In theory it should not be too difficult, take some measures and figure out how a new kitchen could fit into the room,
then tear down everything and put a new kitchen in place. Some things would need professional assistance like disconnecting
the oven from the gas supply and sealing the pipe. Electricity installation would also need outside help but the rest should be a one-man job.
After looking at some kitchen designs and appliances in the IKEA store, taking measures and deciding where to place things and
deciding how to install new water pipes it was time for the sledge hammer to do its work. This was real fun and revealed a rotten
plank under the old refrigerator that had leaked at some time, creating a thriving home for silverfishes. Another discovery was a
passage right behind the kitchen wall for different types of pipes, some of them old and no longer in use and others for gas and sewage.
The next step after removing the old kitchen, taking down the old water pipes and having the gas pipe sealed was to start repairing the walls.
First cover up the hole in the wall containing pipes and then use plaster to create a smooth surface on top of the brick wall. Then came the
tricky part of installing pipes for hot and cold water into the kitchen from the water supply that entered the apartment in the neighboring toilet.
After doing some research into plumbing and convincing myself that this is doable the work began. 14 years later and with no water leaks and hot
and cold water coming out of the tap every time it seems that I managed to do the work properly.
Electricity was less nervous, just telling the electrician the plan of the kitchen. The old electrical distribution board was replaced with modern
circuit breakers and cables leading into the kitchen and outlet for a stove and preparations so you could put up your electrical outlets where you
wanted them. With basic water and electricity preparations done it was time for several visits to IKEA with a lot of flat packages and some heavy
lifting to get all the white goods up the stairs and into the apartment.
Putting up wallpaper turned out to be more difficult than expected. The wall was very uneven and contained several layers of wallpaper to strip off.
After some failed attempts to put strips on the wall I decided to let a professional do the job.
It was less of a problem to put base cabinets, oven and dish washer in place. Everything fitted nice with just a decimeter left to cover up.
With a flat surface to put the countertop on it was time to visit a high-end kitchen design store and shop for a beautiful stone countertop with
a cool sink. Two men delivered the stone and they got it into place without any severe scratches and that was not an easy task. The holes in the stone
for cooktop and sink where made after placing the countertop in its place.
The next challenge was to choose some nice tiles and put them on the wall. Some glassy tiles with a deep red surface were chosen. It was not too hard to put
them up and fill the space in between with grout, a very rewarding work since the result looked great.
Putting up and attaching microwave oven and upper cabinets went well until the last one. When standing on a shaky setup and holding the cabinet with my arms, suddenly one of
the trestle supports collapsed under me. Somehow, I avoided crashing down with the cabinet over me and there was only a minor scratch in
the wallpaper. Finally, the only thing left was to install water for the mixer tap and dishwasher and the kitchen was ready.
Total cost in 2012 prices was 73500 SEK for labor and material.
Gym
On the 4th floor every apartment has a storage space and in one end of the attic there is a big storage space that originally was used for hanging up clothes
to dry after washing them. This space is about 37 m2 and mostly empty. It struck me that this space could come to some better use that
would benefit all residents in the house which has 33 apartments. It would be the perfect place to build a gym. First make a model of the gym,
like a doll house, then convince others that it is a good idea and then build it.
First step, relocate all stuff to other places and empty the room. Biggest problem was some doors that had belonged to apartments.
Some exterior doors and some toilet doors that had an interesting old sign with instructions on how to use the toilet. The doors were solid,
very heavy wooden doors. To get the doors down to the basement for storage I placed a hook into them and attached a rope to glide them down the stairs.
The light in the room was too weak so the ceiling lights were replaced by modern LED-lamps.
Second step, clean up the very dusty floor and walls. This cracked a tooth of mine when a dust particle got stuck between teeth and later caused a chip
to come of. The room looked like the inside of an old barn with dirty walls and uneven wood floor. The walls had to be painted in some suitable color and
the floor needed some repair work and a carpet that would make it even, look good and be nice to walk on.
Third step, paint the walls. To get the right kind of paint for the surface of the wall you take a piece of the wall to the paint store and test how the
surface reacts to different liquids. After that very bubbly reaction I purchased 10 liters of Sylitol bio indoor silicate paint tinted into a light grey color.
The cast-iron sewer pipes looked ugly and worn so they were painted black but now the water-pipes with their soft light grey plastic insulation looked out of style so
they got a layer of black fabric tape to blend in. Then the wooden parts of the room looked dull so they got a layer of varnish to liven up the wooden surface.
Fourth step, floor cover. The biggest worry was how vibrations and sound would affect nearby apartments. It might be a good idea to put extra damping material
under the sheets of vinyl flooring, so I bought a product recommended in the store and covered the wooden floor. If nothing else it would make the surface a bit
softer to walk on. Next thing to buy was the vinyl mat. Even when divided up into two rolls of 2m x 11.2m it was a very heavy challenge to get them up the stairs.
My first impression was that I should have chosen a more elegant design of wood imitation, but that changed after getting used to it.
Everything looked good, only thing missing now was to fill the room with gym equipment.
Fifth step, equipment. In doing the ‘doll house’ exhibition of the gym I had already decided what equipment to have and where to put it. There was a bench press
facility in my attic storage and an old exercise bike in my basement storage so these could now be moved to the gym and free up space in the storages. The rest of
the equipment was bought new. The biggest and costliest items were a universal gym machine and a running mill. The gym machine was assembled on spot from its many
pieces, a one-man job but the running mill was quite heavy and in one piece. This was the one thing of the gym-building-project where assistance was needed.
Sixth step, some final touches. To make it even better; some artwork on the walls, a nice resting chair, an inspirational instruction book for gym training
and finally a padlock on the door. Not an ordinary padlock with numbers but a specially designed one with a 5-letter-code *GYM* as password.
Total cost of gym 42500 SEK of which 14300 SEK spent on renovation and 28200 SEK on gym equipment.